Completed Projects   |    Ongoing Projects   |    Selected Projects   |   


Projects/ Selected Projects / MILITARY FACILITIES

Karadeniz Region HQ's Pier and Quay Construction and Installation works, Kdz. Ereğli, TURKEY
Contractor: METİŞ
Contract Status: Completed 2002
Client: Ministry of Defense, NATO Infrastructure Department
Project Value: $24 Million

Description: The contract covers, construction works for moorings and fire protection, construction of water pump building, site civil works, mechanical and electrical works. 444,960 tons of steel tube piles (32”) , epoxy painting of piles, concrete works for undersea structures. Installation of 8 pieces of mooring post 30 tons each.



Sabiha Gökçen (Kurtköy) Airport superstructure works Phase IV, Istanbul-TURKEY
Contractor: METİŞ
Contract Status: Completed 2002
Client: Ministry of Defense, NATO Infrastructure Department
Project Value: $110 Million

Description: Phase IV Construction comprises, POL Facilities (6” pipeline in 3,500 m length hydrant system), Water Supply and Storing System (2 x 1,500 m 3 water tank and 850 m ductile iron pipeline and 7,700 m PVC pipeline), sanitary galleries, interior roads and auto parks, fencing works, apron entrance control building (48 m 2), security building (7,400 m 2), customs building (2,380 m 2) . Total excavation, 1.5 million cubic meters, asphalt course 44,000 tons, 45,000 cubic meters concrete. Mechanical: Aircraft fuel supply and hydrant systems have been installed, potable and fire water supply and storage are completed. Required fire pumps, water pumps, cold room, air conditioning, kitchen installations, natural gas installations, and HVAC systems are installed. Electrical: Ex-proof telephone system lines are installed, radioactive type lighting protection, taxiway center line fixtures, Master BRITEE system, Control systems, Transformer Controlled Scada System, Fiber Optic Cable, UPS, and Cargo Autopark paying systems have been installed.



Sabiha Gökçen (Kurtköy) Airport Infrastructure Works Phase 1, Istanbul-TURKEY
Contractor : METİŞ
Contract Status : Completed 2002
Client : Ministry of Defense, NATO Infrastructure Department
Project Value : $90 Million

Description :Sabiha Gokcen Airport is one of the biggest airports in Turkey. The whole project has been implemented under the control of the Ministry of Defense NATO Inf. Dept. as 4 phases superstructure and 2 phases infrastructure. Carrying all the typical airport components and utilities; now Sabiha Gokcen Airport is under full operation with rights and utilization of the airport transferred to the Civil Aviation Authority. In general project consists of Runway (45 m x 3000 m), Cargo Apron (158 m x 400 m), Connection Taxiways, Site Drainage, Perimeter Roads, Complete Airbase Lighting, Power Plant, Metering and Protection Center, Regular Buildings and SCADA System Electrical:  Regular Building Construction, Metering and Protection Center; SCADA System; 34.5/6.3 kV high voltage feeders on 34.5/6.3 kV main ring feeder network, power transformers, dynamic interruptible power supply and diesel generators, project design for operation and performance monitoring, remote control and statistical report, supply of materials, installation, start-up and supply and laying 14,000 m fiber optic cable. Runway Lighting System; Neoprene lighting cables, secondary cables, isolating transformers, stable current regulators, runway lighting fixtures, circuit selectors, reil, mania, flash, stop-bar fixtures, runway protection lights, illuminated wind sock, signs, taxiway guidance signs, track signs, safety approach masts, fiber optic cables, signal cables and cable installation Power Plant Construction 10,000 kVA main power transformer, distribution transformers, dynamic UPS, switchgear, etc. Lighting Automatic Control System; CAT I and CAT II runway lighting automation system, software, hardware, fiber optic cable and accessory materials supply, installation and start up. Building:  Metering and Protection Center (142 m 2, h=8 m), 2-H1&H2 Transformer & Regulator Building (139 m 2, h=3.25 m), 3-Reducer Transformer & O.G. Dist. Center (1,522m 2, h=10m) Civil:  Excavation work, runway, apron, taxiway and roads base and sub-base works, asphalt work, concrete work.



Prime Ministry, Command & Operations Center Construction, TURKEY
Contractor : METİŞ
Contract Status : Completed 2001
Client : Ministry of Defense, NATO Infrastructure Department
Project Value : $47 Million
Description :Command and control center and War Headquarters Construction



Diyarbakır Airbase F16 Facilities Phase 2 Construction, Diyarbakır - TURKEY
Contractor : METİŞ
Contract Status : Completed 1997
Client : Ministry of Defense, NATO Infrastructure Department
Project Value : $18 Million

Description: Squadron HQ’s building, ammunition storage depots (13 ea), electric power system, administration building, water transmission system, access roads, parking platforms, drainage works, mechanical and electrical works of all buildings and depots.



Diyarbakır Airbase F16 Facilities Phase 1 Construction, Diyarbakır - TURKEY
Contractor: METİŞ-GÜNAY-ALARKO JV
Contract Status: Completed 1995
Client: Ministry of Defense, NATO Infrastructure Department
Project Value: $65 Million

Description: Project elements include: one hush-house noise suppression system, three ea JP4 steel fuel tank, complete POL plant, one avionics workshop together with all necessary mechanical and electrical installations, one aircraft engine workshop, 15,000 cum reinforced concrete, 53,000 cum excavation, 37,000 cum fill. 109 pcs of prefabricated beam of various dimensions. One 85 kvA, one 100 kVA, two 600 kVA and one 750 kVA diesel generator sets. UPS system, frequency converters, rectifiers, transformers, chiller groups, monorail crane and boilers.



Konya Airbase Runway and Taxiway Restoration and Modernisation, Konya - TURKEY
Contractor: METİŞ-MÖN JV
Contract Status: Completed 1995
Client: Ministry of Defense, NATO Infrastructure Department
Project Value: $50 Million

Description: Restoration of existing runway, parallel taxiway. 270,000 cubic meters excavation, 325,000 cubic meters fill, 178,000sqm of geotextile application, 67,000 cubic meter pavement concrete and 78,000 tons of asphalt pavement. Complete runway and taxiway lighting with elevated lights, isolating transformers and runway cabling systems.



Diyarbakır Airbase Runway and Taxiway Renovation, Diyarbakır - TURKEY
Contractor: METİŞ-GÜNAY-ÖZSAN JV
Contract Status: Completed 1994
Client: Ministry of Defense, NATO Infrastructure Department
Project Value: $45 Million
Description: Restoration of existing runway, parallel taxiway. 286,000 cubic meters excavation, 475,000 cubic meters fill, 65,000sqm of geotextile application, 276,000 sqm pavement concrete and 3616 tons of asphalt pavement. Complete runway and taxiway lighting with elevated lights, isolating transformers and runway cabling systems.


Command & Control Center War HQ’s, TURKEY
Contractor:METİŞ
Contract Status: Completed 1993
Client: Ministry of Defense, NATO Infrastructure Department
Project Value: $60 Million
Description: Command and control center and War Headquarters Construction


Improvement and Renovation of Disco-Hit War H/Q's, TURKEY
Contractor: METİŞ
Contract Status: Completed 1991
Client: Ministry of Defense, NATO Infrastructure Department
Project Value: $65 Million
Description: War Headquarters Construction.


Canakkale POL Facilities and Pier Construction, Canakkale-TURKEY
Contractor: METİŞ
Contract Status: Completed 1975
Client: Ministry of Defense, NATO Infrastructure Department
Project Value: $10 Million
Description: One 170 m long, 8 meter wide pier having reinforced concrete deck on steel piles with cathodic protection, bollards, cleats, rings, loaders and fenders together with fire fighting, water mains and pier lighting. Four semi-buried steel fuel storage tanks, warehouses, cold storage depots, equipment buildings, semi-hardened generator building and administration buildings. Two 60 kW diesel generator sets. 3200 meters of fuel transmission line with various diameters.