Projects/ Selected Projects /
MILITARY FACILITIES
 | Karadeniz Region HQ's Pier and Quay Construction and Installation works, Kdz.
Ereğli, TURKEY | | Contractor | : |
METİŞ | | Contract Status | : |
Completed 2002 | | Client | : |
Ministry of Defense, NATO Infrastructure Department | | Project Value | : |
$24 Million | |
Description: The contract covers, construction works for moorings and fire protection, construction
of water pump building, site civil works, mechanical and electrical works. 444,960
tons of steel tube piles (32”) , epoxy painting of piles, concrete works for undersea
structures. Installation of 8 pieces of mooring post 30 tons each. |
 | Sabiha Gökçen (Kurtköy) Airport superstructure works Phase IV, Istanbul-TURKEY | | Contractor | : |
METİŞ | | Contract Status | : |
Completed 2002 | | Client | : |
Ministry of Defense, NATO Infrastructure Department | | Project Value | : |
$110 Million | |
Description: Phase IV Construction comprises,
POL Facilities (6” pipeline in 3,500 m length hydrant system), Water Supply and
Storing System (2 x 1,500 m
3 water tank and 850 m ductile iron pipeline and 7,700 m PVC pipeline), sanitary
galleries, interior roads and auto parks, fencing works, apron entrance control
building (48 m
2), security building (7,400 m
2), customs building (2,380 m
2) .
Total excavation, 1.5 million cubic meters, asphalt course 44,000 tons, 45,000
cubic meters concrete.
Mechanical:
Aircraft fuel supply and hydrant systems have been installed, potable and fire
water supply and storage are completed. Required fire pumps, water pumps, cold
room, air conditioning, kitchen installations, natural gas installations, and
HVAC systems are installed. Electrical:
Ex-proof telephone system lines are installed, radioactive type lighting protection,
taxiway center line fixtures, Master BRITEE system, Control systems, Transformer
Controlled Scada System, Fiber Optic Cable, UPS, and Cargo Autopark paying systems
have been installed. |
 | Sabiha Gökçen (Kurtköy) Airport Infrastructure Works Phase 1, Istanbul-TURKEY | |
Contractor |
: |
METİŞ | |
Contract Status |
: |
Completed 2002 | |
Client |
: |
Ministry of Defense, NATO Infrastructure Department | |
Project Value |
: |
$90 Million | |
Description :Sabiha Gokcen Airport is one of the biggest airports in Turkey. The whole project
has been implemented under the control of the Ministry of Defense NATO Inf.
Dept.
as 4 phases superstructure and 2 phases infrastructure. Carrying all the typical
airport components and utilities; now Sabiha Gokcen Airport is under full
operation
with rights and utilization of the airport transferred to the Civil Aviation
Authority. In general project consists of Runway (45 m x 3000 m), Cargo Apron
(158 m x 400
m), Connection Taxiways, Site Drainage, Perimeter Roads, Complete Airbase
Lighting,
Power Plant, Metering and Protection Center, Regular Buildings and SCADA System
Electrical:
Regular Building Construction, Metering and Protection Center;
SCADA System;
34.5/6.3 kV high voltage feeders on 34.5/6.3 kV main ring feeder network,
power
transformers, dynamic interruptible power supply and diesel generators, project
design for operation and performance monitoring, remote control and statistical
report, supply of materials, installation, start-up and supply and laying 14,000
m fiber optic cable. Runway Lighting System;
Neoprene lighting cables, secondary cables, isolating transformers, stable
current
regulators, runway lighting fixtures, circuit selectors, reil, mania, flash, stop-bar
fixtures, runway protection lights, illuminated wind sock, signs, taxiway guidance
signs, track signs, safety approach masts, fiber optic cables, signal cables and
cable installation Power Plant Construction
10,000 kVA main power transformer, distribution transformers, dynamic UPS,
switchgear,
etc.
Lighting Automatic Control System;
CAT I and CAT II runway lighting automation system, software, hardware, fiber
optic cable and accessory materials supply, installation and start up.
Building:
Metering and Protection Center (142 m
2, h=8 m),
2-H1&H2 Transformer & Regulator Building (139 m
2, h=3.25 m), 3-Reducer Transformer & O.G. Dist. Center (1,522m
2, h=10m) Civil:
Excavation work, runway, apron, taxiway and roads base and sub-base
works, asphalt
work, concrete work. |
 | Prime Ministry, Command & Operations Center Construction, TURKEY | | Contractor |
: |
METİŞ | | Contract Status |
: |
Completed 2001 | | Client |
: |
Ministry of Defense, NATO Infrastructure Department | | Project Value |
: |
$47 Million | | Description | : | Command and control center and War Headquarters Construction |
 | Diyarbakır Airbase F16 Facilities Phase 2 Construction, Diyarbakır - TURKEY | | Contractor |
: |
METİŞ | | Contract Status |
: |
Completed 1997 | | Client |
: |
Ministry of Defense, NATO Infrastructure Department | | Project Value |
: |
$18 Million | |
Description: Squadron HQ’s building, ammunition storage depots (13 ea), electric power system,
administration building, water transmission system, access roads, parking platforms,
drainage works, mechanical and electrical works of all buildings and depots. |
 | Diyarbakır Airbase F16 Facilities Phase 1 Construction, Diyarbakır - TURKEY | | Contractor | : |
METİŞ-GÜNAY-ALARKO JV | | Contract Status | : |
Completed 1995 | | Client | : |
Ministry of Defense, NATO Infrastructure Department | | Project Value | : |
$65 Million | |
Description: Project elements include: one hush-house noise suppression system, three ea
JP4 steel fuel tank, complete POL plant, one avionics workshop together with all
necessary mechanical and electrical installations, one aircraft engine workshop,
15,000 cum reinforced concrete, 53,000 cum excavation, 37,000 cum fill. 109 pcs
of prefabricated beam of various dimensions. One 85 kvA, one 100 kVA, two 600
kVA and one 750 kVA diesel generator sets. UPS system, frequency converters, rectifiers,
transformers, chiller groups, monorail crane and boilers. |
 | Konya Airbase Runway and Taxiway Restoration and Modernisation, Konya - TURKEY | | Contractor | : |
METİŞ-MÖN JV | | Contract Status | : |
Completed 1995 | | Client | : |
Ministry of Defense, NATO Infrastructure Department | | Project Value | : |
$50 Million | |
Description: Restoration of existing runway, parallel taxiway. 270,000 cubic meters excavation,
325,000 cubic meters fill, 178,000sqm of geotextile application, 67,000 cubic
meter pavement concrete and 78,000 tons of asphalt pavement. Complete runway and
taxiway lighting with elevated lights, isolating transformers and runway cabling
systems. |
 | Diyarbakır Airbase Runway and Taxiway Renovation, Diyarbakır - TURKEY | | Contractor | : |
METİŞ-GÜNAY-ÖZSAN JV | | Contract Status | : |
Completed 1994 | | Client | : |
Ministry of Defense, NATO Infrastructure Department | | Project Value | : |
$45 Million | | Description: Restoration of existing runway, parallel taxiway. 286,000 cubic meters excavation,
475,000 cubic meters fill, 65,000sqm of geotextile application, 276,000 sqm pavement
concrete and 3616 tons of asphalt pavement. Complete runway and taxiway lighting
with elevated lights, isolating transformers and runway cabling systems. |
 | Command & Control Center War HQ’s, TURKEY | | Contractor | : | METİŞ | | Contract Status | : |
Completed 1993 | | Client | : |
Ministry of Defense, NATO Infrastructure Department | | Project Value | : |
$60 Million | | Description | : |
Command and control center and War Headquarters Construction |
 | Improvement and Renovation of Disco-Hit War H/Q's, TURKEY | | Contractor | : |
METİŞ | | Contract Status | : |
Completed 1991 | | Client | : |
Ministry of Defense, NATO Infrastructure Department | | Project Value | : |
$65 Million | | Description | : |
War Headquarters Construction. |
 | Canakkale POL Facilities and Pier Construction, Canakkale-TURKEY | | Contractor | : |
METİŞ | | Contract Status | : |
Completed 1975 | | Client | : |
Ministry of Defense, NATO Infrastructure Department | | Project Value | : |
$10 Million | | Description: One 170 m long, 8 meter wide pier having reinforced concrete deck on steel piles
with cathodic protection, bollards, cleats, rings, loaders and fenders together
with fire fighting, water mains and pier lighting. Four semi-buried steel fuel
storage tanks, warehouses, cold storage depots, equipment buildings, semi-hardened
generator building and administration buildings. Two 60 kW diesel generator sets.
3200 meters of fuel transmission line with various diameters. |
|
|
Projects /
Selected Projects
/
MILITARY FACILITIES
|
|
|
| |
|